ScholarGate
어시스턴트

방법 비교

선택한 방법을 나란히 검토하세요. 서로 다른 행은 강조 표시됩니다.

비선형 차분 GMM×시스템 GMM (Arellano-Bover / Blundell-Bond)×
분야계량경제학계량경제학
계열Regression modelRegression model
기원 연도1991–20101998
창시자Wooldridge; building on Arellano and Bond (1991)Arellano & Bover (1995); Blundell & Bond (1998)
유형Nonlinear panel estimatorDynamic panel data estimator
원전Wooldridge, J. M. (2010). Econometric Analysis of Cross Section and Panel Data (2nd ed.). MIT Press. ISBN: 9780262232586Arellano, M. & Bond, S. (1991). Some Tests of Specification for Panel Data: Monte Carlo Evidence and an Application to Employment Equations. Review of Economic Studies, 58(2), 277-297. DOI ↗
별칭nonlinear diff-GMM, nonlinear Arellano-Bond GMM, first-difference nonlinear GMM, NL-GMMArellano-Bover estimator, Blundell-Bond estimator, dynamic panel GMM, Sistem GMM (Arellano-Bover / Blundell-Bond)
관련54
요약Nonlinear Difference GMM extends the Arellano-Bond difference GMM estimator to models where the structural relationship between the outcome and its predictors is inherently nonlinear. By first-differencing to eliminate individual fixed effects and then applying GMM moment conditions with lagged levels as instruments, it consistently estimates parameters in dynamic panel settings without requiring a linear functional form.System GMM is a generalized method of moments estimator for dynamic panel models that contain a lagged dependent variable. Introduced by Blundell and Bond (1998), building on Arellano and Bover, it augments the differenced equation of the earlier difference GMM (Arellano-Bond) with the equation in levels to deliver consistent estimates when N is large and T is small.
ScholarGate데이터셋
  1. v1
  2. 2 출처
  3. PUBLISHED
  1. v1
  2. 3 출처
  3. PUBLISHED

검색으로 이동 슬라이드 다운로드

ScholarGate방법 비교: Nonlinear difference GMM · System GMM. 2026-06-17에 다음에서 검색함: https://scholargate.app/ko/compare