Multi-period Interrupted Time Series
Multi-period Interrupted Time Series (MITS) extends the classic ITS framework to settings where two or more interventions occur at known time points within the same series. By fitting a segmented regression with multiple breakpoints, MITS estimates the level change and slope change attributable to each intervention while controlling for the underlying secular trend and for the effects of earlier interruptions.
Quellendatensatz
Zitate wörtlich aus dem Quellendatensatz der Methode übernommen. Daraus wird keine Überprüfung auf Claim-Ebene abgeleitet.
- Kontopantelis, E., Doran, T., Springate, D. A., Buchan, I., & Reeves, D. (2015). Regression based quasi-experimental approach when randomisation is not an option: interrupted time series analysis. BMJ, 350, h2750. · DOI 10.1136/bmj.h2750
- Bernal, J. L., Cummins, S., & Gasparrini, A. (2017). Interrupted time series regression for the evaluation of public health interventions: a tutorial. International Journal of Epidemiology, 46(1), 348-355. · DOI 10.1093/ije/dyw098
Kuratiert Claims
Claims im Evidenz-Ledger gespeichert, jeder mit seiner eigenen Bewertung.
Diese Ansicht erfindet keine Claim-Bewertung, wenn das Ledger keine hat.
Verwandte Methoden
Generiert aus dem Methoden-Graphen und als maschinell vorgeschlagene Beziehungen angezeigt – es wird kein Evidenz-Claim abgeleitet.