ScholarGate
助手

方法对比

并排查看您选择的方法;存在差异的行会高亮显示。

Kanban×物料需求计划×SCOR 模型×快速换模(SMED)×
领域运营管理运营管理运营管理运营管理
方法族Machine learningMachine learningMachine learningMachine learning
起源年份1950197519961985
提出者Taiichi OhnoJoseph OrlickyPittiglio, Rabin, Todd & McGrathShigeo Shingo
类型Production control systemMaterial planning algorithmSupply chain reference frameworkSetup time reduction technique
开创性文献Ohno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Stewart, G. (1997). Supply chain operations reference model: SCOR, logistics information management, Vol. 10 No. 5, pp. 62-74. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
别名visual management, pull systemMRP, MRP Iquick changeover, rapid setup
相关5555
摘要Kanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.The Supply Chain Operations Reference Model is a standardized framework for supply chain management developed by the Supply Chain Council (now APICS) in 1996. SCOR provides a structured approach to identify, evaluate, and improve supply chain processes across organizations, regardless of industry. It integrates planning, sourcing, manufacturing, delivery, and returns into a coherent operational model.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGate数据集
  1. v1
  2. 2 来源
  3. PUBLISHED
  1. v1
  2. 2 来源
  3. PUBLISHED
  1. v1
  2. 2 来源
  3. PUBLISHED
  1. v1
  2. 2 来源
  3. PUBLISHED

前往搜索 下载幻灯片

ScholarGate方法对比: Kanban · Material Requirements Planning · SCOR Model · SMED. 于 2026-06-19 检索自 https://scholargate.app/zh/compare