ScholarGate
Asistent

Uporedite metode

Pregledajte izabrane metode jednu pored druge; redovi koji se razlikuju su istaknuti.

AR model sa strukturnim prekidom×ARIMA model sa strukturnim lomom×
OblastEkonometrijaEkonometrija
PorodicaRegression modelRegression model
Godina nastanka1989-20031989-1998
TvoracPerron (1989); Bai & Perron (1998, 2003)Perron (1989); extended by Bai & Perron (1998)
TipTime-series model with structural changeTime series model with regime detection
Temeljni izvorBai, J., & Perron, P. (2003). Computation and analysis of multiple structural change models. Journal of Applied Econometrics, 18(1), 1-22. DOI ↗Bai, J., & Perron, P. (1998). Estimating and testing linear models with multiple structural changes. Econometrica, 66(1), 47-78. DOI ↗
Drugi naziviAR model with structural change, breakpoint AR model, piecewise autoregressive model, AR model with regime shiftsARIMA with structural breaks, break-adjusted ARIMA, piecewise ARIMA, ARIMA with regime shifts
Srodne63
SažetakThe structural break AR model extends the standard autoregressive framework by allowing the intercept and autoregressive coefficients to shift at one or more unknown break dates. Each regime between consecutive break points is governed by its own AR parameters, capturing abrupt changes in the dynamics of a time series caused by crises, policy shifts, or other shocks.A structural break ARIMA model extends the standard ARIMA framework by explicitly identifying and accommodating one or more abrupt shifts in the level, trend, or dynamics of a time series. Rather than forcing a single set of ARIMA parameters across the entire sample, it fits separate ARIMA specifications for each regime defined by the detected break dates.
ScholarGateSkup podataka
  1. v1
  2. 2 Izvori
  3. PUBLISHED
  1. v1
  2. 2 Izvori
  3. PUBLISHED

Idi na pretragu Preuzmi slajdove

ScholarGateUporedite metode: Structural Break AR Model · Structural Break ARIMA Model. Preuzeto 2026-06-15 sa https://scholargate.app/sr/compare