방법 비교
선택한 방법을 나란히 검토하세요. 서로 다른 행은 강조 표시됩니다.
| 선형 최대 정규화× | 복합 비례 평가× | |
|---|---|---|
| 분야 | 의사결정 | 의사결정 |
| 계열 | MCDM | MCDM |
| 기원 연도≠ | 1967 | 1996 |
| 창시자≠ | Fishburn, P. C. | Zavadskas, E. K., Kaklauskas, A. |
| 유형≠ | Normalization (linear-max, ratio-based) | Proportional assessment (benefit/cost split) |
| 원전≠ | Fishburn, P. C. (1967). Additive Utilities with Incomplete Product Sets: Application to Priorities and Assignments. Operations Research DOI ↗ | Zavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗ |
| 별칭 | — | — |
| 관련≠ | 4 | 8 |
| 요약≠ | LINEAR-MAX-NORMALIZATION (Linear Max Normalization — division by column maximum (benefit) or column minimum over value (cost)) is a normalization multi-criteria decision-making (MCDM) method introduced by Fishburn, P. C. in 1967. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result. | COPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result. |
| ScholarGate데이터셋 ↗ |
|
|