ScholarGate
Asistent

Usporedite metode

Pregledajte odabrane metode jednu uz drugu; retci koji se razlikuju su istaknuti.

Agregatno planiranje×SCOR model×SMED×
PodručjeUpravljanje operacijamaUpravljanje operacijamaUpravljanje operacijama
ObiteljMachine learningMachine learningMachine learning
Godina nastanka199219961985
TvoracWallace, T. F.Pittiglio, Rabin, Todd & McGrathShigeo Shingo
VrstaDemand-supply planning frameworkSupply chain reference frameworkSetup time reduction technique
Temeljni izvorWallace, T. F. (1992). Sales & Operations Planning: The how-to handbook. Cincinnati: APICS Publications. link ↗Stewart, G. (1997). Supply chain operations reference model: SCOR, logistics information management, Vol. 10 No. 5, pp. 62-74. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
Drugi nazivisales and operations planning, production planningquick changeover, rapid setup
Srodne555
SažetakAggregate Planning (or Sales & Operations Planning, S&OP) is a collaborative, iterative process that balances demand and supply at a high level—typically grouping products into families and planning over a 3–18 month horizon. Developed formally by Tom Wallace and popularized through APICS, aggregate planning helps organizations align sales forecasts, production capacity, inventory, and workforce to meet demand efficiently while managing costs. It serves as the bridge between strategic business plans and detailed operational execution.The Supply Chain Operations Reference Model is a standardized framework for supply chain management developed by the Supply Chain Council (now APICS) in 1996. SCOR provides a structured approach to identify, evaluate, and improve supply chain processes across organizations, regardless of industry. It integrates planning, sourcing, manufacturing, delivery, and returns into a coherent operational model.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateSkup podataka
  1. v1
  2. 2 Izvori
  3. PUBLISHED
  1. v1
  2. 2 Izvori
  3. PUBLISHED
  1. v1
  2. 2 Izvori
  3. PUBLISHED

Idi na pretraživanje Preuzmi prezentaciju

ScholarGateUsporedite metode: Aggregate Planning · SCOR Model · SMED. Preuzeto 2026-06-19 s https://scholargate.app/hr/compare