ScholarGate
Assistant

Comparer des méthodes

Examinez les méthodes sélectionnées côte à côte ; les lignes qui diffèrent sont mises en évidence.

Planification des Besoins en Matières×Ordonnancement d'ateliers×
DomaineGestion des opérationsGestion des opérations
FamilleMachine learningMachine learning
Année d'origine19752016
Auteur d'origineJoseph OrlickyPinedo, M. L.
TypeMaterial planning algorithmCombinatorial scheduling problem
Source fondatriceOrlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Pinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗
AliasMRP, MRP Ijob scheduling, machine scheduling
Apparentées55
RésuméMaterial Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.Job shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.
ScholarGateJeu de données
  1. v1
  2. 2 Sources
  3. PUBLISHED
  1. v1
  2. 2 Sources
  3. PUBLISHED

Aller à la recherche Télécharger les diapositives

ScholarGateComparer des méthodes: Material Requirements Planning · Job Shop Scheduling. Consulté le 2026-06-19 sur https://scholargate.app/fr/compare