方法证据记录
SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
源记录
引文逐字复制自方法源记录。这些引文不代表任何层级的验证。
Single Minute Exchange of Die
分类方法记录 · ml-model / operations-management
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
精选声明
声明已持久化到证据分类账中,每个声明都有自己的评估。
尚无精选声明
当分类账中没有声明时,此视图不会自行创建声明评估。
相关方法
从方法图中生成,显示为机器建议的关系 — 不推断任何证据声明。