方法证据记录
Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
源记录
引文逐字复制自方法源记录。这些引文不代表任何层级的验证。
Risk-based Statistical Process Control Chart
分类方法记录 · process-pipeline / experimental-design
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
精选声明
声明已持久化到证据分类账中,每个声明都有自己的评估。
尚无精选声明
当分类账中没有声明时,此视图不会自行创建声明评估。
相关方法
从方法图中生成,显示为机器建议的关系 — 不推断任何证据声明。