ScholarGate
助手

方法对比

并排查看您选择的方法;存在差异的行会高亮显示。

快速换模(SMED)×综合计划×
领域运营管理运营管理
方法族Machine learningMachine learning
起源年份19851992
提出者Shigeo ShingoWallace, T. F.
类型Setup time reduction techniqueDemand-supply planning framework
开创性文献Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗Wallace, T. F. (1992). Sales & Operations Planning: The how-to handbook. Cincinnati: APICS Publications. link ↗
别名quick changeover, rapid setupsales and operations planning, production planning
相关55
摘要Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.Aggregate Planning (or Sales & Operations Planning, S&OP) is a collaborative, iterative process that balances demand and supply at a high level—typically grouping products into families and planning over a 3–18 month horizon. Developed formally by Tom Wallace and popularized through APICS, aggregate planning helps organizations align sales forecasts, production capacity, inventory, and workforce to meet demand efficiently while managing costs. It serves as the bridge between strategic business plans and detailed operational execution.
ScholarGate数据集
  1. v1
  2. 2 来源
  3. PUBLISHED
  1. v1
  2. 2 来源
  3. PUBLISHED

前往搜索 下载幻灯片

ScholarGate方法对比: SMED · Aggregate Planning. 于 2026-06-18 检索自 https://scholargate.app/zh/compare