ScholarGate
助手

方法对比

并排查看您选择的方法;存在差异的行会高亮显示。

最优潮流×牛顿-拉夫逊潮流计算法×机组组合×
领域电气工程电气工程电气工程
方法族Process / pipelineProcess / pipelineProcess / pipeline
起源年份196219671959
提出者Jean CarpentierWilliam F. Tinney, Charles E. HartCharles J. Baldwin
类型Nonlinear constrained optimization for power system operationIterative solution algorithm for power system steady-state analysisCombinatorial optimization for generator turn-on/turn-off scheduling
开创性文献Carpentier, J. (1962). Contribution à l'étude du dispatching économique. Bulletin de la Société Française des Électriciens, 8(3), 431-447. link ↗Tinney, W. F., & Hart, C. E. (1967). Power flow solution by Newton's method. IEEE Transactions on Power Apparatus and Systems, 86(11), 1449-1460. DOI ↗Baldwin, C. J., Dale, K. M., & Dittrich, R. F. (1959). A study of the economic shutdown of generating units in daily dispatch. AIEE Transactions, 78(3), 272-282. link ↗
别名OPF, Economic Dispatch with ConstraintsNR Power Flow, Newton-Raphson Load FlowUC, Generator Commitment, Thermal Unit Scheduling
相关333
摘要Optimal Power Flow (OPF) is a fundamental optimization framework for computing the most economical and secure operating point of an electrical power system. Introduced by Jean Carpentier in 1962, OPF minimizes operational costs (fuel, losses, or other expenses) while satisfying physical and operational constraints. Modern electric grids depend on OPF for real-time economic dispatch, security analysis, and planning, making it one of the most important problems in power systems engineering.The Newton-Raphson method is a powerful iterative technique for solving the nonlinear power flow equations in electrical power systems. Introduced by Tinney and Hart in 1967, it became the industry standard for computing steady-state voltage and power distributions across transmission networks. The method uses Jacobian matrix formulations to rapidly converge to the true operating point.Unit Commitment (UC) is the problem of deciding which power generation units should be switched on or off over a planning horizon (typically 24-168 hours) to minimize total operating cost while meeting demand and reserve requirements. Introduced by Baldwin et al. in 1959, UC is a fundamental scheduling problem in power system operations, combining combinatorial optimization (which units to commit) with continuous optimization (optimal power output). UC remains one of the most important and computationally challenging problems in power systems.
ScholarGate数据集
  1. v1
  2. 3 来源
  3. PUBLISHED
  1. v1
  2. 3 来源
  3. PUBLISHED
  1. v1
  2. 3 来源
  3. PUBLISHED

前往搜索 下载幻灯片

ScholarGate方法对比: Optimal Power Flow · Newton-Raphson Power Flow · Unit Commitment. 于 2026-06-18 检索自 https://scholargate.app/zh/compare