ScholarGate
助手

方法对比

并排查看您选择的方法;存在差异的行会高亮显示。

Lane 的边际品位模型×Lerchs-Grossmann 算法×
领域采矿工程采矿工程
方法族Process / pipelineProcess / pipeline
起源年份19881965
提出者K. F. LaneHelmut Lerchs and Israel Grossmann
类型Economic optimization framework for ore classificationGraph-theoretic algorithm for pit limit optimization
开创性文献Lane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗
别名Lane Model, Cut-off Grade Optimization, Lane's Optimization ModelLerchs-Grossmann Method, LG Algorithm
相关34
摘要Lane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.
ScholarGate数据集
  1. v1
  2. 2 来源
  3. PUBLISHED
  1. v1
  2. 2 来源
  3. PUBLISHED

前往搜索 下载幻灯片

ScholarGate方法对比: Cut-off Grade (Lane) · Lerchs-Grossmann Algorithm. 于 2026-06-17 检索自 https://scholargate.app/zh/compare