Process / pipelineGraph-based Optimization
Lerchs-Grossmann 算法
Lerchs-Grossmann 算法是一种图论方法,用于确定露天采矿作业中的最终采坑边界。该算法由 Helmut Lerchs 和 Israel Grossmann 于 1965 年提出,可在遵守边坡稳定性的约束条件下,最大化矿石的净现值。该算法构成了大多数现代采坑优化软件的理论基础。
阅读完整方法
仅限会员
登录使用免费账户登录即可阅读本节。
Method map
The neighbourhood of related methods — select a node to explore.
来源
- Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗
- Johnson, T. B. (2014). Optimum pit limits - definition and computational procedures. Journal of the Australasian Institute of Mining and Metallurgy, 249, 21-28. link ↗
如何引用本页
ScholarGate. (2026, June 3). Lerchs-Grossmann Algorithm for Open Pit Mine Design. ScholarGate. https://scholargate.app/zh/mining-engineering/lerchs-grossmann-algorithm
Which method?
Set this method beside its closest kin and read them side by side — the library lays the books on the table; the choice is yours.
Compare side by side →