SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Запис джерела
Цитати скопійовано дослівно з вихідного запису методу. Вони не передбачають перевірки на рівні тверджень.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Відібрані твердження
Твердження збережено в журналі доказів, кожне зі своєю оцінкою.
Цей перегляд не вигадує оцінку твердження, якщо в журналі її немає.
Пов'язані методи
Згенеровано з графа методів і показано як рекомендовані системою зв'язки — жодне твердження доказів не передбачається.