ScholarGate
Asistent

Uporedite metode

Pregledajte izabrane metode jednu pored druge; redovi koji se razlikuju su istaknuti.

Model Laneove granične vrednosti×Bondov indeks rada×
OblastRudarstvoRudarstvo
PorodicaProcess / pipelineProcess / pipeline
Godina nastanka19881952
TvoracK. F. LaneFred C. Bond
TipEconomic optimization framework for ore classificationEmpirical method for grinding energy estimation
Temeljni izvorLane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Bond, F. C. (1952). The third theory of comminution. Transactions of the American Institute of Mining and Metallurgical Engineers, 193, 484-494. link ↗
Drugi naziviLane Model, Cut-off Grade Optimization, Lane's Optimization ModelBond Work Index, BWI, Bond Index Test
Srodne33
SažetakLane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.The Bond Work Index, introduced by Fred C. Bond in 1952, is an empirical parameter that characterizes the resistance of an ore to grinding in a tumbling mill. It is defined as the kilowatt-hours per short ton (kWh/st) of electrical energy required to reduce a coarse ore from theoretically infinite size to 80% passing 100 micrometers. The Bond Index is foundational in mineral processing plant design and cost estimation worldwide.
ScholarGateSkup podataka
  1. v1
  2. 2 Izvori
  3. PUBLISHED
  1. v1
  2. 2 Izvori
  3. PUBLISHED

Idi na pretragu Preuzmi slajdove

ScholarGateUporedite metode: Cut-off Grade (Lane) · Bond Work Index. Preuzeto 2026-06-18 sa https://scholargate.app/sr/compare