ScholarGate
Asistent

Porovnať metódy

Prezrite si vybrané metódy vedľa seba; riadky, ktoré sa líšia, sú zvýraznené.

Model sivého predikčného vyhladávania GM(1,1)×Model ARIMA (Autoregressive Integrated Moving Average)×
OdborSoft computingEkonometria
RodinaRegression modelRegression model
Rok vzniku19822015
TvorcaJulong DengBox & Jenkins (Box-Jenkins methodology)
TypSmall-sample grey forecasting modelUnivariate time-series model
Pôvodný zdrojDeng, J. L. (1982). Control problems of grey systems. Systems & Control Letters, 1(5), 288–294. DOI ↗Box, G. E. P., Jenkins, G. M., Reinsel, G. C. & Ljung, G. M. (2015). Time Series Analysis: Forecasting and Control (5th ed.). Wiley. ISBN: 978-1118675021
Ďalšie názvyGM(1,1), grey prediction model, grey forecasting, gri tahmin modeliBox-Jenkins model, ARIMA(p,d,q), ARIMA Modeli
Príbuzné25
ZhrnutieGM(1,1) is the core forecasting model of grey system theory, introduced by Julong Deng in 1982, designed to predict from very few observations and incomplete information — situations where classical time-series models like ARIMA need far more data. It accumulates the raw series to expose a hidden exponential trend, fits a first-order grey differential equation, and projects future values, making it popular in engineering, energy, and management forecasting with short data records.ARIMA is a univariate time-series forecasting model that combines autoregressive, integrated (differencing), and moving-average components to predict a single continuous series from its own past. It is the centrepiece of the Box-Jenkins methodology set out in Box, Jenkins, Reinsel & Ljung's Time Series Analysis (5th ed., 2015).
ScholarGateDátová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 1 Zdroje
  3. PUBLISHED

Prejsť na hľadanie Stiahnuť snímky

ScholarGatePorovnať metódy: GM(1,1) Grey Forecasting · ARIMA. Získané 2026-06-18 z https://scholargate.app/sk/compare