SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Исходная запись
Цитирование скопировано дословно из исходной записи метода. На его основании не делается никаких выводов о проверке на уровне утверждения.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Курируемые утверждения
Утверждения сохранены в реестре доказательств, каждое со своей оценкой.
Этот вид не создает оценку утверждения, если в реестре ее нет.
Связанные методы
Сгенерировано из графа методов и показано как предложенные машиной связи — никаких выводов об утверждениях доказательств не делается.