ScholarGate
Ассистент

Сравнение методов

Просматривайте выбранные методы рядом; строки с различиями подсвечены.

Маршрутизация запасов×Канбан×Планирование потребности в материалах×
ОбластьОперационный менеджментОперационный менеджментОперационный менеджмент
СемействоMachine learningMachine learningMachine learning
Год появления201419501975
Автор методаCoelho, L. C., Cordeau, J. F., & Laporte, G.Taiichi OhnoJoseph Orlicky
ТипOptimization problemProduction control systemMaterial planning algorithm
Основополагающий источникCoelho, L. C., Cordeau, J. F., & Laporte, G. (2014). Thirty years of inventory routing. Transportation Research Part B: Methodological, 55, 28-67. DOI ↗Ohno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗
Другие названияIRP, vendor-managed logisticsvisual management, pull systemMRP, MRP I
Связанные555
СводкаThe Inventory Routing Problem (IRP) is an optimization problem that jointly determines inventory levels at customer locations, delivery routes, and shipment quantities to minimize total logistics and inventory holding costs. Rather than treating inventory management and vehicle routing as separate decisions, IRP recognizes that they are interdependent: larger shipments reduce routing costs but increase inventory holding costs, and vice versa. IRP is solved using mixed-integer programming, heuristics, and metaheuristics, and is a cornerstone of vendor-managed inventory (VMI) programs.Kanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
ScholarGateНабор данных
  1. v1
  2. 2 Источники
  3. PUBLISHED
  1. v1
  2. 2 Источники
  3. PUBLISHED
  1. v1
  2. 2 Источники
  3. PUBLISHED

Перейти к поиску Скачать слайды

ScholarGateСравнение методов: Inventory Routing · Kanban · Material Requirements Planning. Получено 2026-06-20 из https://scholargate.app/ru/compare