Comparar métodos
Examine os métodos selecionados lado a lado; as linhas que diferem ficam destacadas.
| Modelo AR com Ruptura Estrutural× | Modelo ARIMA com Quebra Estrutural× | |
|---|---|---|
| Área | Econometria | Econometria |
| Família | Regression model | Regression model |
| Ano de origem≠ | 1989-2003 | 1989-1998 |
| Autor original≠ | Perron (1989); Bai & Perron (1998, 2003) | Perron (1989); extended by Bai & Perron (1998) |
| Tipo≠ | Time-series model with structural change | Time series model with regime detection |
| Fonte seminal≠ | Bai, J., & Perron, P. (2003). Computation and analysis of multiple structural change models. Journal of Applied Econometrics, 18(1), 1-22. DOI ↗ | Bai, J., & Perron, P. (1998). Estimating and testing linear models with multiple structural changes. Econometrica, 66(1), 47-78. DOI ↗ |
| Outros nomes | AR model with structural change, breakpoint AR model, piecewise autoregressive model, AR model with regime shifts | ARIMA with structural breaks, break-adjusted ARIMA, piecewise ARIMA, ARIMA with regime shifts |
| Relacionados≠ | 6 | 3 |
| Resumo≠ | The structural break AR model extends the standard autoregressive framework by allowing the intercept and autoregressive coefficients to shift at one or more unknown break dates. Each regime between consecutive break points is governed by its own AR parameters, capturing abrupt changes in the dynamics of a time series caused by crises, policy shifts, or other shocks. | A structural break ARIMA model extends the standard ARIMA framework by explicitly identifying and accommodating one or more abrupt shifts in the level, trend, or dynamics of a time series. Rather than forcing a single set of ARIMA parameters across the entire sample, it fits separate ARIMA specifications for each regime defined by the detected break dates. |
| ScholarGateConjunto de dados ↗ |
|
|