Kanban×Planejamento das Necessidades de Materiais×SMED×
ÁreaGestão de operaçõesGestão de operaçõesGestão de operações
FamíliaMachine learningMachine learningMachine learning
Ano de origem195019751985
Autor originalTaiichi OhnoJoseph OrlickyShigeo Shingo
TipoProduction control systemMaterial planning algorithmSetup time reduction technique
Fonte seminalOhno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
Outros nomesvisual management, pull systemMRP, MRP Iquick changeover, rapid setup
Relacionados555
ResumoKanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateConjunto de dados
  1. v1
  2. 2 Fontes
  3. PUBLISHED
  1. v1
  2. 2 Fontes
  3. PUBLISHED
  1. v1
  2. 2 Fontes
  3. PUBLISHED

Ir para a pesquisa Baixar slides

ScholarGateComparar métodos: Kanban · Material Requirements Planning · SMED. Recuperado em 2026-06-19 de https://scholargate.app/pt/compare