ScholarGate
Assistent

Methoden vergelijken

Bekijk de geselecteerde methoden naast elkaar; rijen die verschillen zijn gemarkeerd.

GM(1,1) Grijze Voorspellingsmodel×ARIMA (Autoregressive Integrated Moving Average) Model×
VakgebiedSoft computingEconometrie
FamilieRegression modelRegression model
Jaar van ontstaan19822015
GrondleggerJulong DengBox & Jenkins (Box-Jenkins methodology)
TypeSmall-sample grey forecasting modelUnivariate time-series model
Oorspronkelijke bronDeng, J. L. (1982). Control problems of grey systems. Systems & Control Letters, 1(5), 288–294. DOI ↗Box, G. E. P., Jenkins, G. M., Reinsel, G. C. & Ljung, G. M. (2015). Time Series Analysis: Forecasting and Control (5th ed.). Wiley. ISBN: 978-1118675021
AliassenGM(1,1), grey prediction model, grey forecasting, gri tahmin modeliBox-Jenkins model, ARIMA(p,d,q), ARIMA Modeli
Verwant25
SamenvattingGM(1,1) is the core forecasting model of grey system theory, introduced by Julong Deng in 1982, designed to predict from very few observations and incomplete information — situations where classical time-series models like ARIMA need far more data. It accumulates the raw series to expose a hidden exponential trend, fits a first-order grey differential equation, and projects future values, making it popular in engineering, energy, and management forecasting with short data records.ARIMA is a univariate time-series forecasting model that combines autoregressive, integrated (differencing), and moving-average components to predict a single continuous series from its own past. It is the centrepiece of the Box-Jenkins methodology set out in Box, Jenkins, Reinsel & Ljung's Time Series Analysis (5th ed., 2015).
ScholarGateGegevensset
  1. v1
  2. 2 Bronnen
  3. PUBLISHED
  1. v1
  2. 1 Bronnen
  3. PUBLISHED

Naar zoeken Dia's downloaden

ScholarGateMethoden vergelijken: GM(1,1) Grey Forecasting · ARIMA. Geraadpleegd op 2026-06-18 via https://scholargate.app/nl/compare