SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Avota reģistrs
Atsauces kopētas tieši no metodes avota reģistra. Tās nenozīmē nekādu apgalvojumu līmeņa verifikāciju.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Kurēti apgalvojumi
Apgalvojumi saglabāti pierādījumu reģistrā, katram ar savu novērtējumu.
Šis skatījums neizgudro apgalvojumu novērtējumu, ja reģistrā tā nav.
Saistītās metodes
Ģenerēts no metodes grafika un parādīts kā mašīnas ieteiktas attiecības — netiek izvirzīts neviens pierādījumu apgalvojums.