ScholarGate
어시스턴트

방법 비교

선택한 방법을 나란히 검토하세요. 서로 다른 행은 강조 표시됩니다.

광산 환기×슈도플로우 알고리즘×채굴적 배치 최적화×
분야광산공학광산공학광산공학
계열Process / pipelineProcess / pipelineProcess / pipeline
기원 연도188019921960
창시자Mining Engineering PracticeDorit S. HochbaumMining Engineering Practice
유형System design for safe air quality and worker cooling in underground minesEfficient algorithm for maximum closure problemOptimization framework for underground mine excavation design
원전Hartman, H. L., Mutmansky, J. M., Ramani, R. V., & Wang, Y. J. (2012). Mine ventilation and ambient air quality. Society for Mining, Metallurgy & Exploration, Inc. link ↗Hochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
별칭Underground Mine Ventilation, Air Flow Design, Mine Haulage VentilationPseudoflow Algorithm, Hochbaum AlgorithmStope Design, Underground Mine Layout, Panel Design
관련333
요약Mine ventilation is the design and operation of systems that deliver fresh air to underground mining areas and remove contaminated air, heat, and hazardous gases. It is critical for worker safety and productivity, maintaining breathable air (sufficient oxygen, low dust and gas concentrations) and acceptable temperatures. Proper ventilation design requires calculating heat loads from mining operations, determining required air volumes, and designing shaft/drift geometry to deliver adequate flow.The Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGate데이터셋
  1. v1
  2. 2 출처
  3. PUBLISHED
  1. v1
  2. 2 출처
  3. PUBLISHED
  1. v1
  2. 2 출처
  3. PUBLISHED

검색으로 이동 슬라이드 다운로드

ScholarGate방법 비교: Mine Ventilation · Pseudoflow · Stope Layout. 2026-06-18에 다음에서 검색함: https://scholargate.app/ko/compare