ScholarGate
어시스턴트

방법 비교

선택한 방법을 나란히 검토하세요. 서로 다른 행은 강조 표시됩니다.

Lerchs-Grossmann 알고리즘×광산 환기×슈도플로우 알고리즘×
분야광산공학광산공학광산공학
계열Process / pipelineProcess / pipelineProcess / pipeline
기원 연도196518801992
창시자Helmut Lerchs and Israel GrossmannMining Engineering PracticeDorit S. Hochbaum
유형Graph-theoretic algorithm for pit limit optimizationSystem design for safe air quality and worker cooling in underground minesEfficient algorithm for maximum closure problem
원전Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Hartman, H. L., Mutmansky, J. M., Ramani, R. V., & Wang, Y. J. (2012). Mine ventilation and ambient air quality. Society for Mining, Metallurgy & Exploration, Inc. link ↗Hochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗
별칭Lerchs-Grossmann Method, LG AlgorithmUnderground Mine Ventilation, Air Flow Design, Mine Haulage VentilationPseudoflow Algorithm, Hochbaum Algorithm
관련433
요약The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.Mine ventilation is the design and operation of systems that deliver fresh air to underground mining areas and remove contaminated air, heat, and hazardous gases. It is critical for worker safety and productivity, maintaining breathable air (sufficient oxygen, low dust and gas concentrations) and acceptable temperatures. Proper ventilation design requires calculating heat loads from mining operations, determining required air volumes, and designing shaft/drift geometry to deliver adequate flow.The Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.
ScholarGate데이터셋
  1. v1
  2. 2 출처
  3. PUBLISHED
  1. v1
  2. 2 출처
  3. PUBLISHED
  1. v1
  2. 2 출처
  3. PUBLISHED

검색으로 이동 슬라이드 다운로드

ScholarGate방법 비교: Lerchs-Grossmann Algorithm · Mine Ventilation · Pseudoflow. 2026-06-19에 다음에서 검색함: https://scholargate.app/ko/compare