手法を比較

選択した手法を並べて確認できます。異なる行はハイライト表示されます。

リスクベース管理図×プロセス能力解析 (Cp, Cpk)×
分野実験計画法統計学
系統Process / pipelineProcess / pipeline
提唱年1956 (economic design); refined through 1980s–2000s1986
提唱者A. J. Duncan (economic design, 1956); T. J. Lorenzen & L. C. Vance (unified economic model, 1986)Victor Kane
種類Quantitative process monitoring methodQuantitative process evaluation index
原典Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. DOI ↗Kane, V. E. (1986). Process capability indices. Journal of Quality Technology, 18(1), 41–52. DOI ↗
別名economic control chart, risk-integrated SPC, cost-based control chart, economic design of control chartsProcess Capability Indices, Capability Study, Süreç Yeterlilik Analizi, Process Performance Analysis
関連62
概要A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.Process Capability Analysis quantifies how well a manufacturing or business process produces output within specified tolerance limits. Introduced formally by Victor Kane in 1986, it summarises process spread and centering into dimensionless indices — most notably Cp and Cpk — allowing engineers and quality managers to judge whether a stable process is inherently capable of meeting customer or design specifications consistently.
ScholarGateデータセット
  1. v1
  2. 2 出典
  3. PUBLISHED
  1. v1
  2. 1 出典
  3. PUBLISHED

検索へ Download slides

ScholarGate手法を比較: Risk-based control chart · Process Capability Analysis. 2026-06-15に以下より取得 https://scholargate.app/ja/compare