ScholarGate
アシスタント

手法を比較

選択した手法を並べて確認できます。異なる行はハイライト表示されます。

パネル・アレラーノ・ボンド GMM 推定器×動的パネルデータモデル×
分野計量経済学計量経済学
系統Regression modelRegression model
提唱年19911988–1991
提唱者Manuel Arellano and Stephen BondArellano & Bond (1991); Holtz-Eakin, Newey & Rosen (1988)
種類Dynamic panel GMM estimatorDynamic regression / GMM estimation
原典Arellano, M., & Bond, S. (1991). Some tests of specification for panel data: Monte Carlo evidence and an application to employment equations. Review of Economic Studies, 58(2), 277–297. DOI ↗Arellano, M., & Bond, S. (1991). Some tests of specification for panel data: Monte Carlo evidence and an application to employment equations. Review of Economic Studies, 58(2), 277–297. DOI ↗
別名Arellano-Bond GMM, AB-GMM, difference GMM estimator, dynamic panel GMMdynamic panel model, panel data model with lagged dependent variable, DPD model, Arellano-Bond model
関連55
概要The Arellano-Bond GMM estimator addresses the two core problems of dynamic panel models — individual fixed effects correlated with the regressors, and the endogeneity introduced by a lagged dependent variable — by first-differencing to remove fixed effects and then using lagged levels of the dependent variable as internal instruments.The dynamic panel data model extends standard panel regression by including a lagged value of the outcome variable as a regressor, capturing persistence and adjustment dynamics. Because the lagged dependent variable is correlated with the unit-specific fixed effect, ordinary OLS or within estimators are biased; GMM-based methods using internal instruments are the standard remedy.
ScholarGateデータセット
  1. v1
  2. 2 出典
  3. PUBLISHED
  1. v1
  2. 2 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Panel Arellano-Bond GMM · Dynamic Panel Data Model. 2026-06-18に以下より取得 https://scholargate.app/ja/compare