ScholarGate
アシスタント

手法を比較

選択した手法を並べて確認できます。異なる行はハイライト表示されます。

資材所要量計画×カンバン×
分野オペレーションズ・マネジメントオペレーションズ・マネジメント
系統Machine learningMachine learning
提唱年19751950
提唱者Joseph OrlickyTaiichi Ohno
種類Material planning algorithmProduction control system
原典Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Ohno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗
別名MRP, MRP Ivisual management, pull system
関連55
概要Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.Kanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.
ScholarGateデータセット
  1. v1
  2. 2 出典
  3. PUBLISHED
  1. v1
  2. 2 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Material Requirements Planning · Kanban. 2026-06-18に以下より取得 https://scholargate.app/ja/compare