資材所要量計画×ジョブショップスケジューリング×
分野オペレーションズ・マネジメントオペレーションズ・マネジメント
系統Machine learningMachine learning
提唱年19752016
提唱者Joseph OrlickyPinedo, M. L.
種類Material planning algorithmCombinatorial scheduling problem
原典Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Pinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗
別名MRP, MRP Ijob scheduling, machine scheduling
関連55
概要Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.Job shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.
ScholarGateデータセット
  1. v1
  2. 2 出典
  3. PUBLISHED
  1. v1
  2. 2 出典
  3. PUBLISHED

検索へ スライドをダウンロード

ScholarGate手法を比較: Material Requirements Planning · Job Shop Scheduling. 2026-06-19に以下より取得 https://scholargate.app/ja/compare