SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Record di origine
Citazioni copiate testualmente dal record di origine del metodo. Non si inferisce alcuna verifica a livello di affermazione da esse.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Affermazioni curate
Affermazioni persistite nel registro delle evidenze, ciascuna con la propria valutazione.
Questa vista non inventa una valutazione dell'affermazione quando il registro non ne ha.
Metodi correlati
Generato dal grafo dei metodi e mostrato come relazioni suggerite dalla macchina — nessuna affermazione di evidenza viene inferita.