ScholarGate
Assistente

Confronta i metodi

Esamina i metodi selezionati fianco a fianco; le righe che differiscono sono evidenziate.

Pianificazione dei Fabbisogni di Materiale×Modello SCOR×SMED×
CampoGestione delle operazioniGestione delle operazioniGestione delle operazioni
FamigliaMachine learningMachine learningMachine learning
Anno di origine197519961985
IdeatoreJoseph OrlickyPittiglio, Rabin, Todd & McGrathShigeo Shingo
TipoMaterial planning algorithmSupply chain reference frameworkSetup time reduction technique
Fonte seminaleOrlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Stewart, G. (1997). Supply chain operations reference model: SCOR, logistics information management, Vol. 10 No. 5, pp. 62-74. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
AliasMRP, MRP Iquick changeover, rapid setup
Correlati555
SintesiMaterial Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.The Supply Chain Operations Reference Model is a standardized framework for supply chain management developed by the Supply Chain Council (now APICS) in 1996. SCOR provides a structured approach to identify, evaluate, and improve supply chain processes across organizations, regardless of industry. It integrates planning, sourcing, manufacturing, delivery, and returns into a coherent operational model.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateInsieme di dati
  1. v1
  2. 2 Fonti
  3. PUBLISHED
  1. v1
  2. 2 Fonti
  3. PUBLISHED
  1. v1
  2. 2 Fonti
  3. PUBLISHED

Vai alla ricerca Scarica le diapositive

ScholarGateConfronta i metodi: Material Requirements Planning · SCOR Model · SMED. Consultato il 2026-06-19 da https://scholargate.app/it/compare