ScholarGate
Asisten

Bandingkan metode

Tinjau metode pilihan Anda berdampingan; baris yang berbeda akan disorot.

Uji Zivot-Andrews Structural Break Test×Model ARIMA (Autoregressive Integrated Moving Average)×
BidangEkonometrikaEkonometrika
KeluargaRegression modelRegression model
Tahun asal19921970
PencetusEric Zivot and Donald W. K. AndrewsGeorge Box and Gwilym Jenkins
TipeUnit root test with endogenous structural breakTime series forecasting model
Sumber perintisZivot, E., & Andrews, D. W. K. (1992). Further evidence on the great crash, the oil-price shock, and the unit-root hypothesis. Journal of Business & Economic Statistics, 10(3), 251–270. DOI ↗Box, G. E. P., & Jenkins, G. M. (1970). Time Series Analysis: Forecasting and Control. Holden-Day. link ↗
AliasZA test, Zivot-Andrews unit root test, endogenous structural break unit root test, ZA structural break testARIMA, Box-Jenkins model, integrated ARMA, ARIMA(p,d,q)
Terkait66
RingkasanThe Zivot-Andrews (ZA) test is a unit root test that endogenously identifies the most likely location of a single structural break in a time series. Unlike the standard ADF test, it does not require the researcher to pre-specify when the break occurred, making it robust to data-driven regime shifts such as policy changes, financial crises, or major economic events.The ARIMA(p,d,q) model is the standard workhorse for univariate time series forecasting. It combines autoregressive terms (past values), differencing to induce stationarity, and moving average terms (past shocks) into a unified linear framework. Developed by Box and Jenkins (1970), it remains one of the most widely applied models in econometrics and applied statistics.
ScholarGateSet data
  1. v1
  2. 2 Sumber
  3. PUBLISHED
  1. v1
  2. 2 Sumber
  3. PUBLISHED

Ke halaman pencarian Unduh salindia

ScholarGateBandingkan metode: Zivot-Andrews Structural Break Test · ARIMA model. Diakses 2026-06-17 dari https://scholargate.app/id/compare