SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Izvorni zapis
Citati kopirani doslovno iz izvornog zapisa metode. Ne impliciraju nikakvu provjeru na razini tvrdnje.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Uređene tvrdnje
Tvrdnje pohranjene u knjigu dokaza, svaka s vlastitom procjenom.
Ovaj prikaz ne izmišlja procjenu tvrdnje kada knjiga dokaza nema nijednu.
Povezane metode
Generirano iz grafa metode i prikazano kao strojno predložene relacije — ne implicira se nikakva tvrdnja dokaza.