Usporedite metode
Pregledajte odabrane metode jednu uz drugu; retci koji se razlikuju su istaknuti.
| Složena proporcionalna procjena× | Korelacijski kriteriji i standardna devijacija objektivnog ponderiranja× | |
|---|---|---|
| Područje | Donošenje odluka | Donošenje odluka |
| Obitelj | MCDM | MCDM |
| Godina nastanka≠ | 1996 | 2010 |
| Tvorac≠ | Zavadskas, E. K., Kaklauskas, A. | Wang, Y. M., Luo, Y. |
| Vrsta≠ | Proportional assessment (benefit/cost split) | Correlation-penalised standard-deviation weighting |
| Temeljni izvor≠ | Zavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗ | Wang, Y. M., Luo, Y. (2010). Integration of correlations with standard deviations for determining attribute weights in multiple attribute decision making. Mathematical and Computer Modelling DOI ↗ |
| Drugi nazivi | — | — |
| Srodne | 8 | 8 |
| Sažetak≠ | COPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result. | CCSD (Criteria Correlation and Standard Deviation objective weighting) is a weight objective multi-criteria decision-making (MCDM) method introduced by Wang, Y. M., Luo, Y. in 2010. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result. |
| ScholarGateSkup podataka ↗ |
|
|