Aller au contenuScholarGate
BibliothèqueMa bibliothèqueBureauReview StudioAssistant
Se connecter
SMED/Preuve
Dossier de preuve de méthode

SMED

Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.

Sources recorded, not reviewed

Dossier source

Citations copiées telles quelles du dossier source de la méthode. Aucune vérification au niveau de la revendication n'en est déduite.

Single Minute Exchange of Die
Dossier de méthode taxonomique · ml-model / operations-management
  • Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
  • McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Ouvrir la méthode complète

Revendications organisées

Revendications enregistrées dans le registre de preuves, chacune avec sa propre évaluation.

Pas encore de revendications organisées

Cette vue n'invente pas d'évaluation de revendication lorsque le registre n'en contient aucune.

Méthodes apparentées

Généré à partir du graphe de méthodes et présenté comme des relations suggérées par la machine — aucune revendication de preuve n'est déduite.

Same method familyAggregate Planningmachine-suggested · Relational suggestion, not evidence.Same method familyAssembly Line Balancingmachine-suggested · Relational suggestion, not evidence.Same method familyJob Shop Schedulingmachine-suggested · Relational suggestion, not evidence.Taxonomic bucketKanbanmachine-suggested · Relational suggestion, not evidence.Same method familyTotal Productive Maintenancemachine-suggested · Relational suggestion, not evidence.

Statut de la preuve

Sources recorded, not reviewed

Bibliographic sources are present. Claim-level evidence review has not been performed.

Sources

2 citations enregistrées, copiées du dossier source de la méthode.

Actions

Ouvrir la page de la méthode
ScholarGate

Une bibliothèque de référence centrée sur le contenu, dédiée aux méthodes de recherche — ce qu'est chaque méthode, comment elle fonctionne et d'où elle vient.

Données ouvertes (CC-BY)

Découvrir

  • Bibliothèque
  • Rechercher des méthodes…
  • Parcourir par domaine
  • Domaines
  • Cheminement
  • Comparer
  • Quelle méthode ?

Référence

  • Disciplines
  • Atlas
  • Glossaire
  • Méthodologie
  • Philosophie

Espace de travail

  • Ma bibliothèque
  • Bureau
  • Chat

Entreprise

  • À propos
  • Tarifs
  • Contact
  • Proposer une méthode

Les entrées sont compilées à partir de sources publiées à titre de référence. Il vous appartient de vérifier l'exactitude et l'adéquation de toute information à votre propre usage.

© 2026 ScholarGate · Bibliothèque de référence des méthodes de recherche
  • Confidentialité
  • Cookies
  • Conditions
  • Supprimer le compte