ScholarGate
Assistant

Comparer des méthodes

Examinez les méthodes sélectionnées côte à côte ; les lignes qui diffèrent sont mises en évidence.

Plan d'Aménagement Systématique (SLP)×Kanban×
DomaineGestion des opérationsGestion des opérations
FamilleMachine learningMachine learning
Année d'origine19731950
Auteur d'origineMuther, R.Taiichi Ohno
TypeLayout design methodologyProduction control system
Source fondatriceMuther, R. (1973). Systematic layout planning (2nd ed.). Boston: Cahners Books. link ↗Ohno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗
AliasSLP, plant layoutvisual management, pull system
Apparentées55
RésuméSystematic Layout Planning (SLP) is a structured methodology developed by Richard Muther in the 1960s–1970s for designing optimal plant and facility layouts. The approach systematizes the consideration of material flow, personnel movement, equipment relationships, and space constraints to minimize material handling costs, improve safety, and enhance flexibility. SLP has become the foundational framework for facility design in manufacturing, warehousing, and service environments.Kanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.
ScholarGateJeu de données
  1. v1
  2. 2 Sources
  3. PUBLISHED
  1. v1
  2. 2 Sources
  3. PUBLISHED

Aller à la recherche Télécharger les diapositives

ScholarGateComparer des méthodes: Facility Layout (SLP) · Kanban. Consulté le 2026-06-17 sur https://scholargate.app/fr/compare