ScholarGate
Asistente

Comparar métodos

Revisa los métodos seleccionados uno junto a otro; las filas que difieren aparecen resaltadas.

Modelo ARIMA con Roturas Estructurales×Modelo ARIMA (Autoregressive Integrated Moving Average)×
CampoEconometríaEconometría
FamiliaRegression modelRegression model
Año de origen1989-19981970
Autor originalPerron (1989); extended by Bai & Perron (1998)George Box and Gwilym Jenkins
TipoTime series model with regime detectionTime series forecasting model
Fuente seminalBai, J., & Perron, P. (1998). Estimating and testing linear models with multiple structural changes. Econometrica, 66(1), 47-78. DOI ↗Box, G. E. P., & Jenkins, G. M. (1970). Time Series Analysis: Forecasting and Control. Holden-Day. link ↗
AliasARIMA with structural breaks, break-adjusted ARIMA, piecewise ARIMA, ARIMA with regime shiftsARIMA, Box-Jenkins model, integrated ARMA, ARIMA(p,d,q)
Relacionados36
ResumenA structural break ARIMA model extends the standard ARIMA framework by explicitly identifying and accommodating one or more abrupt shifts in the level, trend, or dynamics of a time series. Rather than forcing a single set of ARIMA parameters across the entire sample, it fits separate ARIMA specifications for each regime defined by the detected break dates.The ARIMA(p,d,q) model is the standard workhorse for univariate time series forecasting. It combines autoregressive terms (past values), differencing to induce stationarity, and moving average terms (past shocks) into a unified linear framework. Developed by Box and Jenkins (1970), it remains one of the most widely applied models in econometrics and applied statistics.
ScholarGateConjunto de datos
  1. v1
  2. 2 Fuentes
  3. PUBLISHED
  1. v1
  2. 2 Fuentes
  3. PUBLISHED

Ir a la búsqueda Descargar diapositivas

ScholarGateComparar métodos: Structural Break ARIMA Model · ARIMA model. Recuperado el 2026-06-17 de https://scholargate.app/es/compare