ScholarGate
Assistent

Methoden vergleichen

Prüfen Sie die ausgewählten Methoden nebeneinander; abweichende Zeilen sind hervorgehoben.

Inventoryverwaltung und Routenplanung×Kanban×Material Requirements Planning×
FachgebietProduktions- und BetriebsmanagementProduktions- und BetriebsmanagementProduktions- und Betriebsmanagement
FamilieMachine learningMachine learningMachine learning
Entstehungsjahr201419501975
UrheberCoelho, L. C., Cordeau, J. F., & Laporte, G.Taiichi OhnoJoseph Orlicky
TypOptimization problemProduction control systemMaterial planning algorithm
Wegweisende QuelleCoelho, L. C., Cordeau, J. F., & Laporte, G. (2014). Thirty years of inventory routing. Transportation Research Part B: Methodological, 55, 28-67. DOI ↗Ohno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗
AliasnamenIRP, vendor-managed logisticsvisual management, pull systemMRP, MRP I
Verwandt555
ZusammenfassungThe Inventory Routing Problem (IRP) is an optimization problem that jointly determines inventory levels at customer locations, delivery routes, and shipment quantities to minimize total logistics and inventory holding costs. Rather than treating inventory management and vehicle routing as separate decisions, IRP recognizes that they are interdependent: larger shipments reduce routing costs but increase inventory holding costs, and vice versa. IRP is solved using mixed-integer programming, heuristics, and metaheuristics, and is a cornerstone of vendor-managed inventory (VMI) programs.Kanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
ScholarGateDatensatz
  1. v1
  2. 2 Quellen
  3. PUBLISHED
  1. v1
  2. 2 Quellen
  3. PUBLISHED
  1. v1
  2. 2 Quellen
  3. PUBLISHED

Zur Suche Folien herunterladen

ScholarGateMethoden vergleichen: Inventory Routing · Kanban · Material Requirements Planning. Abgerufen am 2026-06-20 von https://scholargate.app/de/compare