Multi-period Interrupted Time Series
Multi-period Interrupted Time Series (MITS) extends the classic ITS framework to settings where two or more interventions occur at known time points within the same series. By fitting a segmented regression with multiple breakpoints, MITS estimates the level change and slope change attributable to each intervention while controlling for the underlying secular trend and for the effects of earlier interruptions.
Zdrojový záznam
Citace zkopírované doslovně ze zdrojového záznamu metody. Nejsou z nich vyvozovány žádné ověření na úrovni tvrzení.
- Kontopantelis, E., Doran, T., Springate, D. A., Buchan, I., & Reeves, D. (2015). Regression based quasi-experimental approach when randomisation is not an option: interrupted time series analysis. BMJ, 350, h2750. · DOI 10.1136/bmj.h2750
- Bernal, J. L., Cummins, S., & Gasparrini, A. (2017). Interrupted time series regression for the evaluation of public health interventions: a tutorial. International Journal of Epidemiology, 46(1), 348-355. · DOI 10.1093/ije/dyw098
Spravovaná tvrzení
Tvrzení uložená v registru důkazů, každé s vlastním hodnocením.
Tento pohled nevymýšlí hodnocení tvrzení, pokud registr žádné neobsahuje.
Související metody
Vygenerováno z grafu metod a zobrazeno jako strojově navržené vztahy – nejsou z nich vyvozována žádná tvrzení o důkazech.