ScholarGate
Asistent

Porovnat metody

Prohlédněte si vybrané metody vedle sebe; řádky, které se liší, jsou zvýrazněny.

Model ARIMA se strukturálními změnami×Model ARIMA (Autoregressive Integrated Moving Average)×Bai-Perronův test vícenásobných strukturálních zlomů×
OborEkonometrieEkonometrieEkonometrie
RodinaRegression modelRegression modelHypothesis test
Rok vzniku1989-199819701998
TvůrcePerron (1989); extended by Bai & Perron (1998)George Box and Gwilym JenkinsJushan Bai & Pierre Perron
TypTime series model with regime detectionTime series forecasting modelSequential hypothesis test for multiple structural breaks
Původní zdrojBai, J., & Perron, P. (1998). Estimating and testing linear models with multiple structural changes. Econometrica, 66(1), 47-78. DOI ↗Box, G. E. P., & Jenkins, G. M. (1970). Time Series Analysis: Forecasting and Control. Holden-Day. link ↗Bai, J., & Perron, P. (1998). Estimating and testing linear models with multiple structural changes. Econometrica, 66(1), 47–78. DOI ↗
Další názvyARIMA with structural breaks, break-adjusted ARIMA, piecewise ARIMA, ARIMA with regime shiftsARIMA, Box-Jenkins model, integrated ARMA, ARIMA(p,d,q)Bai-Perron Multiple Break Test, Multiple Structural Change Test, Sequential Structural Break Test, Çoklu Yapısal Kırılma Testi
Příbuzné362
ShrnutíA structural break ARIMA model extends the standard ARIMA framework by explicitly identifying and accommodating one or more abrupt shifts in the level, trend, or dynamics of a time series. Rather than forcing a single set of ARIMA parameters across the entire sample, it fits separate ARIMA specifications for each regime defined by the detected break dates.The ARIMA(p,d,q) model is the standard workhorse for univariate time series forecasting. It combines autoregressive terms (past values), differencing to induce stationarity, and moving average terms (past shocks) into a unified linear framework. Developed by Box and Jenkins (1970), it remains one of the most widely applied models in econometrics and applied statistics.The Bai-Perron test, introduced by Jushan Bai and Pierre Perron in their landmark 1998 Econometrica paper, is a least-squares-based procedure for detecting, estimating, and testing the number of structural breaks in a linear regression model estimated on time-series data. Unlike single-break tests, it simultaneously identifies multiple change-points in a sample, providing economists and empirical researchers with a rigorous, data-driven way to locate parameter instability across time.
ScholarGateDatová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 1 Zdroje
  3. PUBLISHED

Přejít na hledání Stáhnout prezentaci

ScholarGatePorovnat metody: Structural Break ARIMA Model · ARIMA model · Bai-Perron Test. Získáno 2026-06-18 z https://scholargate.app/cs/compare