ScholarGate
Assistent

Compara mètodes

Revisa els mètodes seleccionats l'un al costat de l'altre; les files que difereixen es ressalten.

Algorisme Pseudoflow×Model de Grau de Tall de Lane×Optimització del Disseny de Talls×
CampEnginyeria de minesEnginyeria de minesEnginyeria de mines
FamíliaProcess / pipelineProcess / pipelineProcess / pipeline
Any d'origen199219881960
Autor originalDorit S. HochbaumK. F. LaneMining Engineering Practice
TipusEfficient algorithm for maximum closure problemEconomic optimization framework for ore classificationOptimization framework for underground mine excavation design
Font seminalHochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗Lane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
ÀliesPseudoflow Algorithm, Hochbaum AlgorithmLane Model, Cut-off Grade Optimization, Lane's Optimization ModelStope Design, Underground Mine Layout, Panel Design
Relacionats333
ResumThe Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.Lane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateConjunt de dades
  1. v1
  2. 2 Fonts
  3. PUBLISHED
  1. v1
  2. 2 Fonts
  3. PUBLISHED
  1. v1
  2. 2 Fonts
  3. PUBLISHED

Ves a la cerca Baixa les diapositives

ScholarGateCompara mètodes: Pseudoflow · Cut-off Grade (Lane) · Stope Layout. Recuperat el 2026-06-18 de https://scholargate.app/ca/compare