ScholarGate
Assistent

Compara mètodes

Revisa els mètodes seleccionats l'un al costat de l'altre; les files que difereixen es ressalten.

Algorisme Pseudoflow×Optimització del Disseny de Talls×
CampEnginyeria de minesEnginyeria de mines
FamíliaProcess / pipelineProcess / pipeline
Any d'origen19921960
Autor originalDorit S. HochbaumMining Engineering Practice
TipusEfficient algorithm for maximum closure problemOptimization framework for underground mine excavation design
Font seminalHochbaum, D. S. (1992). A new-old algorithm for minimum-cut and maximum-flow problems. Journal of the ACM, 1(1), 76-109. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
ÀliesPseudoflow Algorithm, Hochbaum AlgorithmStope Design, Underground Mine Layout, Panel Design
Relacionats33
ResumThe Pseudoflow Algorithm, developed by Dorit Hochbaum in 1992, is a polynomial-time algorithm for computing maximum weighted closures in directed acyclic graphs. In mining, it solves the ultimate pit limit problem more efficiently than earlier methods. By maintaining feasible pseudoflows and iteratively eliminating negative-cost nodes, it achieves near-optimal practical performance even on industrial-scale block models.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateConjunt de dades
  1. v1
  2. 2 Fonts
  3. PUBLISHED
  1. v1
  2. 2 Fonts
  3. PUBLISHED

Ves a la cerca Baixa les diapositives

ScholarGateCompara mètodes: Pseudoflow · Stope Layout. Recuperat el 2026-06-17 de https://scholargate.app/ca/compare