物料需求计划×作业车间调度×
领域运营管理运营管理
方法族Machine learningMachine learning
起源年份19752016
提出者Joseph OrlickyPinedo, M. L.
类型Material planning algorithmCombinatorial scheduling problem
开创性文献Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Pinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗
别名MRP, MRP Ijob scheduling, machine scheduling
相关55
摘要Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.Job shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.
ScholarGate数据集
  1. v1
  2. 2 来源
  3. PUBLISHED
  1. v1
  2. 2 来源
  3. PUBLISHED

前往搜索 下载幻灯片

ScholarGate方法对比: Material Requirements Planning · Job Shop Scheduling. 于 2026-06-19 检索自 https://scholargate.app/zh/compare