方法对比
并排查看您选择的方法;存在差异的行会高亮显示。
| L = λW× | 价值流图 (VSM)× | |
|---|---|---|
| 领域≠ | 运筹学 | 质量管理 |
| 方法族≠ | Regression model | Process / pipeline |
| 起源年份≠ | 1961 | 1999 |
| 提出者≠ | John D. C. Little | Mike Rother & John Shook |
| 类型≠ | Exact queueing identity | Visual process analysis tool |
| 开创性文献≠ | Little, J. D. C. (1961). A proof for the queuing formula: L = λW. Operations Research, 9(3), 383–387. DOI ↗ | Rother, M., & Shook, J. (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. Lean Enterprise Institute. ISBN: 978-0-9667843-0-5 |
| 别名 | L = λW Theorem, Little's Theorem, Little's Result, Little Yasası | VSM, Material and Information Flow Mapping, Lean Flow Mapping, Değer Akış Haritalama |
| 相关 | 3 | 3 |
| 摘要≠ | Little's Law is a fundamental theorem in queueing theory that relates the long-run average number of items in a stable system (L) to the long-run average arrival rate (λ) and the long-run average time an item spends in the system (W), expressed as L = λW. Introduced and rigorously proved by John D. C. Little in 1961, the law holds for virtually any stable stochastic system, requiring no assumptions about arrival distributions, service distributions, or queue disciplines. | Value Stream Mapping (VSM) is a lean management technique used to visualize, analyze, and improve the flow of materials and information required to bring a product or service from raw input to customer delivery. Introduced by Mike Rother and John Shook in their 1999 workbook Learning to See, VSM draws on the Toyota Production System tradition to expose waste, delays, and non-value-adding activities across the entire production value stream. |
| ScholarGate数据集 ↗ |
|
|