ScholarGate
ผู้ช่วย

เปรียบเทียบวิธี

ดูวิธีที่เลือกเทียบกันแบบเคียงข้าง แถวที่ต่างกันจะถูกเน้นไว้

Infrastructure Studies×Valuation Studies Method×
สาขาวิชาScience Technology StudiesScience Technology Studies
ตระกูลProcess / pipelineProcess / pipeline
ปีกำเนิด19962013
ผู้ริเริ่มSusan Leigh Star, Geoffrey Bowker, Karen RuhlederClaes-Fredrik Helgesson, Fabian Muniesa, Michèle Lamont
ประเภทQualitative method for studying relational infrastructurePractice-oriented method for studying valuation
แหล่งต้นตำรับStar, S. L., & Ruhleder, K. (1996). Steps toward an ecology of infrastructure: design and access for large information spaces. Information Systems Research, 7(1), 111-134. DOI ↗Helgesson, C.-F., & Muniesa, F. (2013). For what it's worth: an introduction to valuation studies. Valuation Studies, 1(1), 1-10. DOI ↗
ชื่อเรียกอื่นInfrastructural inversion, Ecology of infrastructure, Study of boundary objectsSociology of valuation, Valography, Study of evaluation practices
ที่เกี่ยวข้อง44
สรุปThe infrastructure studies method, developed by Susan Leigh Star, Geoffrey Bowker, and Karen Ruhleder, studies the normally invisible relational systems—standards, classifications, pipes, protocols, and installed bases—on which modern life silently depends. Its signature move is 'infrastructural inversion': deliberately foregrounding the background, treating the taken-for-granted substrate as the object of analysis, and reading its standards, classifications, and breakdowns to understand how it shapes work, knowledge, and lives.The valuation studies method treats valuation—the production, measurement, ordering, and contestation of worth—as a social practice to be studied empirically rather than a hidden mental act or a settled economic fact. Consolidated by Claes-Fredrik Helgesson and Fabian Muniesa and complemented by Michèle Lamont's comparative sociology of valuation and evaluation, it follows how rankings, metrics, prices, and evaluation procedures actually do their work, and asks how worth comes to be, by whom, with which devices, and to what effect.
ScholarGateชุดข้อมูล
  1. v1
  2. 2 แหล่งอ้างอิง
  3. PUBLISHED
  1. v1
  2. 2 แหล่งอ้างอิง
  3. PUBLISHED

ไปที่หน้าค้นหา ดาวน์โหลดสไลด์

ScholarGateเปรียบเทียบวิธี: Infrastructure Studies · Valuation Studies Method. สืบค้นเมื่อ 2026-06-24 จาก https://scholargate.app/th/compare