ScholarGate
Msaidizi

Linganisha mbinu

Pitia mbinu ulizochagua bega kwa bega; safu zinazotofautiana zinaangaziwa.

Ubunifu wa Mpangilio wa Stope×Algoriti ya Lerchs-Grossmann×
NyanjaUhandisi wa MadiniUhandisi wa Madini
FamiliaProcess / pipelineProcess / pipeline
Mwaka wa asili19601965
MwanzilishiMining Engineering PracticeHelmut Lerchs and Israel Grossmann
AinaOptimization framework for underground mine excavation designGraph-theoretic algorithm for pit limit optimization
Chanzo asiliaBrady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗
Majina mbadalaStope Design, Underground Mine Layout, Panel DesignLerchs-Grossmann Method, LG Algorithm
Zinazohusiana34
MuhtasariStope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.
ScholarGateSeti ya data
  1. v1
  2. 2 Vyanzo
  3. PUBLISHED
  1. v1
  2. 2 Vyanzo
  3. PUBLISHED

Nenda kwenye utafutaji Pakua slaidi

ScholarGateLinganisha mbinu: Stope Layout · Lerchs-Grossmann Algorithm. Imepatikana 2026-06-17 kutoka https://scholargate.app/sw/compare