SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Källpost
Citat kopierade ordagrant från metodens källpost. Ingen verifiering på källnivå härleds från dem.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Kuraterade påståenden
Påståenden lagrade i bevisloggen, var och en med sin egen bedömning.
Denna vy hittar inte på en påståendebedömning när loggen saknar en.
Relaterade metoder
Genererade från metodgrafen och visade som maskinföreslagna relationer – inga bevispåståenden härleds.