Uporedite metode
Pregledajte izabrane metode jednu pored druge; redovi koji se razlikuju su istaknuti.
| Управљање атмосферским водама× | Процена утицаја на животну средину× | |
|---|---|---|
| Oblast | Inženjerstvo zaštite životne sredine | Inženjerstvo zaštite životne sredine |
| Porodica | Process / pipeline | Process / pipeline |
| Godina nastanka≠ | 1980 | 1970 |
| Tvorac≠ | Urban hydrologists and engineers | U.S. National Environmental Policy Act (NEPA) |
| Tip≠ | design and simulation pipeline | systematic assessment and decision-support pipeline |
| Temeljni izvor≠ | Urbonas, B., & Stahre, P. (1993). Stormwater Best Management Practices and Detention. Prentice Hall. ISBN: 978-0134445915 | Glasson, J., Therivel, R., & Chadwick, A. (2005). Introduction to Environmental Impact Assessment (3rd ed.). Routledge. ISBN: 978-0415303910 |
| Drugi nazivi | urban stormwater, runoff management, wet weather control, low-impact development | EIA, impact assessment, environmental screening, cumulative effects assessment |
| Srodne≠ | 3 | 4 |
| Sažetak≠ | Stormwater management is the planning and engineering of urban water systems to control, treat, and utilize rainwater runoff from developed areas. Traditional approaches (pipes, detention basins) conveyed runoff rapidly to streams or treatment plants; modern green infrastructure approaches (permeable pavements, bioswales, retention ponds) reduce runoff volume through infiltration and reuse while improving water quality. Stormwater management integrates hydrologic modeling, water quality assessment, and infrastructure design to meet regulatory requirements and climate resilience goals. | Environmental Impact Assessment (EIA) is a systematic, structured process to identify, predict, and evaluate the environmental and social consequences of proposed development projects (infrastructure, extraction, manufacturing) before implementation. Mandated by law in most jurisdictions since the 1970s (NEPA in USA, EU Directive 2011/92/EU), EIA integrates scientific analysis of air quality, water resources, biodiversity, noise, and socioeconomic effects with stakeholder consultation and decision-making frameworks to inform project approval, design modification, or rejection. |
| ScholarGateSkup podataka ↗ |
|
|