Планирање потреба од материјала×Raspoređivanje poslova u radionicama×
OblastUpravljanje operacijamaUpravljanje operacijama
PorodicaMachine learningMachine learning
Godina nastanka19752016
TvoracJoseph OrlickyPinedo, M. L.
TipMaterial planning algorithmCombinatorial scheduling problem
Temeljni izvorOrlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Pinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗
Drugi naziviMRP, MRP Ijob scheduling, machine scheduling
Srodne55
SažetakMaterial Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.Job shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.
ScholarGateSkup podataka
  1. v1
  2. 2 Izvori
  3. PUBLISHED
  1. v1
  2. 2 Izvori
  3. PUBLISHED

Idi na pretragu Preuzmi slajdove

ScholarGateUporedite metode: Material Requirements Planning · Job Shop Scheduling. Preuzeto 2026-06-19 sa https://scholargate.app/sr/compare