Algoritam Lerchs-Grossmann×Optimizacija rasporeda otkopnih prostorija×
OblastRudarstvoRudarstvo
PorodicaProcess / pipelineProcess / pipeline
Godina nastanka19651960
TvoracHelmut Lerchs and Israel GrossmannMining Engineering Practice
TipGraph-theoretic algorithm for pit limit optimizationOptimization framework for underground mine excavation design
Temeljni izvorLerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
Drugi naziviLerchs-Grossmann Method, LG AlgorithmStope Design, Underground Mine Layout, Panel Design
Srodne43
SažetakThe Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateSkup podataka
  1. v1
  2. 2 Izvori
  3. PUBLISHED
  1. v1
  2. 2 Izvori
  3. PUBLISHED

Idi na pretragu Preuzmi slajdove

ScholarGateUporedite metode: Lerchs-Grossmann Algorithm · Stope Layout. Preuzeto 2026-06-15 sa https://scholargate.app/sr/compare