Pregledajte izabrane metode jednu pored druge; redovi koji se razlikuju su istaknuti.

Složena proporcionalna procena×CIMAS×
OblastDonošenje odlukaDonošenje odluka
PorodicaMCDMMCDM
Godina nastanka19962025
TvoracZavadskas, E. K., Kaklauskas, A.Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N.
TipProportional assessment (benefit/cost split)Impact-based weighted scoring (criterion-level deviation analysis)
Temeljni izvorZavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. (2025). A New Criteria Importance Assessment (CIMAS) Method in Multi-Criteria Group Decision-Making: Criteria Evaluation for Supplier Selection. FACTA UNIVERSITATIS — Series: Mechanical Engineering DOI ↗
Drugi nazivi
Srodne88
SažetakCOPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.CIMAS (Criterion Impact MeAsurement System) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. in 2025. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateSkup podataka
  1. v1
  2. 1 Izvori
  3. PUBLISHED
  1. v1
  2. 1 Izvori
  3. PUBLISHED

Idi na pretragu Preuzmi slajdove

ScholarGateUporedite metode: COPRAS · CIMAS. Preuzeto 2026-06-17 sa https://scholargate.app/sr/compare